Planning Application Documents: Maps, Drawings and Reports

Each form, plan, drawing and report should have a clear purpose and describe the same site and version of the proposal.

Evidence checked 18 August 2026 · Requirements vary by UK nation and planning authority

Confirm the route, authority and validation list

First identify the UK nation, application type and determining authority. Planning permission, householder, outline, prior approval, lawful-development, listed-building, advertisement and condition applications do not share one universal document list.

For England, national requirements are supplemented by an authority's current published local list. Locally requested information must meet tests of relevance and proportionality; it should not be treated as an unchecked shopping list.

Core documents for planning permission in England

The following table separates the ordinary core from documents that apply only when triggered.

England planning-application core
ItemRole
Correct application formDescribes applicant, site and proposal
Location planMinimum plan identifying the application site
Other necessary plans and drawingsDescribes the proposed development
Ownership certificate and agricultural declarationRecords ownership position and notices
Correct fee or exemptionCompletes the submission requirement
Design and Access StatementRequired only for specified development
Fire StatementRequired for specified relevant high-rise development
Biodiversity informationRequired where England's BNG regime applies
Local-list informationProposal- and site-specific supporting evidence

Maps and design drawings

The location plan identifies the site; the block plan shows site layout; floor plans, elevations, roof plans and sections describe the building or use. Access, visibility, levels, demolition or street-scene drawings may be needed when the proposal cannot be understood without them.

  • Site address and accurate drawing title
  • Unique drawing number, revision and date
  • Existing or proposed status
  • Scale and original paper size
  • Scale bar and key dimensions
  • North on relevant plan views
  • Author and mapping licence where applicable

Supporting reports are triggered, not automatic

A heritage asset may trigger heritage evidence; flood or drainage constraints may trigger an assessment; ecology, trees or habitat impacts may trigger surveys and plans; a new access may trigger transport and visibility information. Noise, extraction, contamination, air quality, lighting, waste, utilities and viability documents depend on the proposal and place.

Examples of site triggers and supporting evidence
TriggerPossible evidence
Listed building, conservation area or archaeologyHeritage statement, schedule of works, photographs or assessment
Flood or drainage constraintFlood-risk, drainage or SuDS information
Habitats, protected species, trees or hedgesEcology, arboricultural, habitat and BNG documents
Traffic, parking or new accessTransport, parking and visibility information
Noise, odour, extraction, lighting or air qualitySpecialist impact assessment and mitigation
Contamination, mining or unstable groundAppropriate land or stability assessment

Biodiversity net gain in England

Where mandatory biodiversity net gain applies, the application needs the prescribed minimum information and scaled habitat material. Householder development remains exempt. From 6 August 2026, the exemption for development on a site no larger than 0.2 hectares applies only where onsite priority habitat is not affected. Other exemptions have their own conditions.

If an exemption is claimed, state the reason accurately. Where BNG applies, distinguish application-stage information from the final Biodiversity Gain Plan, which is generally approved after permission and before development begins.

Design and Access Statements and Fire Statements

Do not add either document to every pack. In England, Design and Access Statements are nationally required for major development, certain development in conservation areas or World Heritage Sites and listed-building consent. A planning Fire Statement applies to specified relevant high-rise buildings and development in their curtilage, subject to the official definitions and exemptions.

Make a document checklist

List every requirement, who will prepare it, its latest revision and the source that requires it. This prevents duplicate purchases and makes gaps visible before submission.

Simple document-control matrix
DocumentRequired byPrepared byRevisionStatus
Location planNational/application requirementApplicant or map providerRecord current issueReady / outstanding
Block and design drawingsProposal and local listDesignerRecord current issueReady / outstanding
Ownership informationNational requirementApplicant or agentApplication dateReady / outstanding
Technical reportConstraint or local listRelevant specialistRecord report versionReady / outstanding

File preparation, privacy and final QA

Issued PDFs are normally the simplest drawing format, but check the current accepted types and size limit. Use descriptive filenames, correct orientation and clear single-page or combined files as that authority directs. Planning application material is commonly published, so remove unnecessary personal details from drawings and reports.

  • Form description matches the drawings
  • Site address and red line match throughout
  • Ownership certificate reflects every red-line parcel
  • Only current drawing revisions are uploaded
  • Existing and proposed states are not mixed
  • Plans, elevations and reports assess the same design
  • Fee, declarations and notices are complete
  • File name, format, size and orientation are checked

Local requirements may differ. Check the current validation list for your planning authority before submitting.

Evidence checked 18 August 2026

Official sources and further reading

Planning requirements differ across the UK. The scope label on each source shows where it applies; always use the current rules for the authority receiving the application.

Questions people also ask

What are the minimum documents for planning permission in England?

The correct form, a location plan and any drawings needed to describe the proposal, ownership and agricultural information, the fee, and any nationally or locally triggered supporting evidence.

Does every application need a block plan?

No universal national rule says so, but proposals involving building work or site layout will normally need a closer plan to be understood.

How do I find the local document requirements?

Use the planning authority's current validation list and the local-requirements prompts for the application route. Check the date and whether each item applies to the proposal.

Is a planning statement always required?

No. It can be locally required or useful for explaining policy compliance, but it is not a universal national document.

What happens if a document is missing?

The authority may treat the application as invalid and pause the process. It can also seek further information after validation where necessary.

Can I submit DWG or DXF drawings?

Do not assume so. The Planning Portal's current list does not include those formats. Issue PDF unless the receiving authority confirms a different method.

Ready to create your planning map?

Search by postcode or address, choose the scale and coverage, add your application boundary and download from UKPlanningMaps.com. For help with an unusual site, call 01856 898 022.

Create your plan at UKPlanningMaps.com ↗

Need the map now?

Create your plan in minutes.

Complete your purchase securely at UKPlanningMaps.com.
Create your plan ↗Questions? 01856 898 022